Ontario Mineral Inventory

Ontario Geological Survey
Permanent Link to this Record: MDI52O09SW00004

Record: MDI52O09SW00004

General

Mineral Record Identification
Record Name(s) K1-1 - 1969
Related Record Type Simple
Related Record(s)
Record Status Developed Prospect With Reported Reserves or Resources
Date Created 1984-Oct-24
Date Last Modified 2023-Aug-24
Created By
Revised By

Commodities

Primary Commodities: Copper, Nickel



Location

Township or Area: Ponsford Lake Area

Latitude: 51° 30' 26.68"    Longitude: -90° 17' 41.4"

UTM Zone: 15    Easting: 687727   Northing: 5709723    UTM Datum: NAD83

Resident Geologist District: Thunder Bay North

NTS Grid: 52O09SW

Point Location Description: west end of pit

Location Method: Field Visit with GPS

Access Description: Pickle Lake is accessed by Provincial Highway 599 approx. 300 km north of the town of Ignace, which is situated on the Trans-Canada Highway #17. The K1-1 site is accessible by all-weather road from Pickle Lake.



Exploration History

1946-50: Trenching, ground magnetic survey and diamond drilling by Central Patricia Gold Mines. 1956-58: Geophysical surveys and diamond drilling by Kapkichi Nickel Mines. 1969: UMEX signed a joint venture agreement with Kapkichi Nickel Mines and conducted magnetometer, EM and geologic surveys. Follow-up drilling led to the discovery of low grade copper and nickel mineralization in mafic and ultramafic rocks. Additional drilling in the immediate area by UMEX outlined 4 principal areas with Cu-Ni mineralization: the K1-1, K1-2, G and J anomalies. 1970: UMEX drilled the Thierry Deposit discovery hole. 1980: UMEX began experimental open pit mining on the K1-1 deposit, witht he ore put through the Thierry mill. 1981: UMEX carried out stripping. 1987-89: UMEX resampled and assayed select holes to test for PGEs. An airborne geophysical survey (EM/Resistivity/Magnetometer/VLF) was flown in 1988. 1990-95: Etruscan Resources Inc. purchased the property with plans to put it in production. 2002: Diamond drilling of Thierry deposit by PGM Ventures – 25 DDH totalling 8952 m – and contracted an EM and Mag survey. 2004 - 2005: Mineral resource estimates and diamond drilling by Richview Resources. 2006: NI 43-101 undertaken by P&E Mining Consultants for Richview, Feb 01, 2006. 2007: Richview Resources commenced 14,000 m surface drilling program around K1-1 open pit and a 3 km corridor of unexplored ground between the Thierry Mine and the K1-1 deposit was cleared of overburden. 2008: Summer program involving excavation, geological mapping, prospecting and geochemical sampling. 2010: Cadillac Ventures Inc. and Richview signed an agreement whereby Cadillac assumed 100% control of the Thierry Project. Cadillac completed 3 deep DDH totalling 3330 m on the Thierry deposit. 2011: Cadillac Ventures drilled 42 DDH totalling 10208.6 m on the K1-1 deposit. 2012: new 43-101 report and resource was released. 2020: Braveheart Resources acquired the property from Cadillac. 2021: Braveheart released a PEA on the project. 2023: Braveheart changed its name to Canadian Critical Minerals Inc. and drilled 7 DDH totalling 2598 m.


Assessment Work on File

Assessment Work on File
Office File Number Online Assessment File Identifier Online Assessment File Directory
52O09SW0012 52O09SW0511 52O09SW0511
52O09SW0011B1 52O09SW0004 52O09SW0004
52O09SW0010 52O09SW0006 52O09SW0006
52O09SW0013 52O09SW0561 52O09SW0561
2.28280 52O09SE2006 52O09SE2006

Geology

Province: Superior

Subprovince: Uchi

Terrane: North Caribou

Domain: Uchi

Belt: Pickle Lake

Geological Age: Mesoarchean  



Geology Comments

Feb 06, 2007 (Mark Puumala) - The area geology is described in MDI52O08NW00003.




Lithology

Lithology Data
Rock Type Rank Composition Texture Relationship
Ultramafic-Unsubdivided 1 Host
Gabbroid-Unsubdivided 2 Host
Amphibolite 3 Mafic Metavolcanic Adjacent

Mineralization

Mineralization and Alteration
Rank Mineral Name Class Economic Mineral Type Alteration Mineral Type Alteration Ranking Alteration Intensity Alteration Style
5ChalcopyriteEconomicOre
10MagnetiteEconomicOre
15PyriteEconomicOre
20PyrrhotiteEconomicOre

Mineralization Comments

Feb 06, 2007 (Mark Puumala) - Patterson (1980) reports that Umex outlined an ore deposit containing 73 million tons grading 0.39% Cu and 0.11% Ni at this location based on the results of a 100 hole diamond drilling program. This deposit is hosted in an approximately east-west striking, lensoid body of metamorphosed intrusion consisting of gabbro (25%), mafic gabbro (25%) and biotite hornblende schist (50%). Figure 13 of Sage and Breaks (1982) indicates that the intrusion has a strike-length of approximately 2700 m. Rare pods of peridotite and talc-carbonated schist are reported to be associated with the mafic gabbro (Patterson 1980). The northern contact of the intrusion is fault-bounded, while the southern contact has been interpreted to be conformable with the adjacent mafic metavolcanics (amphibolite schist). The ultramafic rocks of the intrusion are reported by Patterson (1980) to have been altered to biotite-chlorite schist in zones up to 50 m wide adjacent to contacts with amphibolite fault zones and cross-cutting dikes.



Assay Samples

Assay Samples
CommodityAnalytical MethodDigestion Method ResultUnitLimitQualifier
CobaltUnknown164ppm
CobaltUnknown180ppm
CopperUnknown7920ppm
CopperUnknown5960ppm
NickelUnknown1320ppm
NickelUnknown1200ppm

Mineral Record Details

Classification
RankClassification            
1 Mafic-Ultramafic Intrusion
Characteristics
Rank Characteristic            
1 Disseminated
Reserves or Resources Data
Zone Year Category Tonnes Reference Comments Commodities
K1-1 2021 Inferred Mineral Resource 53614000 Braveheart 2021 PEA Pit constrained, $12 cut-off NSR Copper 0.38 %, Gold 0.03 g/t, Nickel 0.1 %, Palladium 0.14 g/t, Platinum 0.05 g/t, Silver 1.8 g/t
K1-1 2012 Inferred Mineral Resource 53614000 43-101 by P&E Mining Consultants, May15 2012 Copper 0.38 Percent, Gold 0.03 Grams per Tonne, Nickel 0.10 Percent, Palladium 0.14 Grams per Tonne, Platinum 0.05 Grams per Tonne, Silver 1.83 Grams per Tonne
K1-1 1980 Unclassified 73000000 Patterson, G.C. 1980. 73 million tons grading 0.39% Cu and 0.11% Ni. Estimate pre-dates NI 43-101 Copper 0.39 Percent, Nickel 0.11 Percent

References

Publication - Technical Report and Preliminary Economic Assessment of the Thierry and K1-1 Cu-Ni-PGE Deposits; Thierry Project, Pickle Lake Area, Patricia Mining District, North-Western Ontario, Canada

Publication Number: 2012 43-101 Date: 2012

Author: Puritch, E., Armstrong, T., Burga, D., Routledge, R., Pearson, J.L.

Publisher Name:

Location:


MonoMap - Geology of the Cat Lake-Pickle Lake area, districts of Kenora and Thunder Bay

Publication Number: R207 Date: 1982

Author: Sage R.P., Breaks F.W.

Publisher Name: Ontario Geological Survey

Location:


Book - The Geology of the Kapkichi Lake Ultramafic-Mafic Bodies and Related Cu-Ni Mineralization, Pickle Lake, Ontario.

Publication Number: Date:

Author: Patterson G.C. 1980.

Publisher Name: unpublished thesis, Carleton University, Ottawa, 331p.

Location: Thunder Bay RGP


Map - Geological series, Precambrian geology, Pickle Lake area, western part

Publication Number: P3056 Scale: 1:50,000    Date: 1989

Author: Stott G.M., Brown G.H., Coleman V.J., Green G.M., Reilly B.A.

Publisher Name: Ontario Geological Survey

Location:


Map - Cat Lake-Pickle Lake, geological compilation series, Kenora and Thunder Bay districts

Publication Number: M2218 Scale: 1:253,440    Date: 1976

Author: Sage R.P., Breaks F.W., Troup W.R.

Publisher Name: Ontario Division of Mines

Location:


Report an Error

We are continuously updating our assessment file / technical report information. If you notice errors in the data, please contact us.


Terms of Use

Please review our Terms of Use agreement for this data product.


Ministry Contact Information

For detailed information regarding this mineral record please contact the Thunder Bay North Resident Geologist District Office