MINES (last updated: 2022-04-29 )
GeologyOntario has moved and you should be redirected to the new GeologyOntario in 5 seconds.
Permanent Link to this Record: 08323
Abandoned Mine Identifier: 08323
Official Name: Chesterville
Site Classification: B
Primary Commodity: Gold
Long Name: 2017600053300
Date Mine Opened:
Date Mine Closed:
Mine Closure Reason: Ceasing Production - Other
Mine Closure Plan: No
Rehabilitation Plan: No
Mine Plans on File: Yes
Legal Jurisdiction: Mining Act
Date Record Last Modified: 2014-06-11
Township or Area: Mcgarry
District: Kirkland Lake
NTS Number: 032D04
Longitude (dd): -79.57378 | Latitude (dd): 48.13909
UTM Zone: 17 | Easting: 606102 | Northing: 5332743
Operational Access Description: Acess; In The Town Of Kearns Proceed South On Kearns Ave From Hwy 66 To Townsley Ave. Turn Right, Keep Right And Proceed Sw On The Kearns Beach Road. At The Fork Keep Left And Proceed Across The Bridge To The Kearns Beach (chesterville Tailings Site). Year 2000 Survey Reports Tailings Located At The Extreme End Of The Northeast Arm Of Larder Lake; Past Producer; 1906 A 16m Adit And Shaft. Circa 1907, Two 9m Prospect Shafts. Producing From 1938-52 Via An 861m Shaft; 3/4 Mile Ne. Of Virginiatown; Milled 3,260,719 Tons.; Year 2000: Shaft 2m X 2m X 3m, Filled Within 3m Of Collar With Muck; Open Shaft 6m X 2m X > 25m, Three Compartment With Timber Collar; Raise 1.5m X 1.5m Covered With Steel Grating, Timber Collar; Ventilation Raise 3m X 3m X > 25m; Raise 3m X 3m With Concrete Cap; Raise With Surface Subsidence 2m X 2m X > 25m; Adit Filled With Muck; Pit Caused By Mine Subsidence 200m X 100m X 20m Deep; Open Pit Partially Filled With Large Boulders; Mill Foundation; Concrete Conveyor Trench Foundation; Crusher Foundation; Office Foundation Includes 3m X 3m X7m High Concrete Wall. Microfiche # 390.
Mineral Deposit Identifier: MDI32D04SE00012
The information herein is provided by MINES free of charge and for information purposes only. All information is provided "as is" without warranties or conditions of any kind either expressed or implied. In providing this AMIS database information, MINES and the Government of Ontario accept no liability and make no warranty or any representation regarding the use, accuracy, applicability, completeness, performance, availability , security or reliability of the information. MINES is not responsible for, nor does it independently verify any information, through field measurements or otherwise. It is the sole responsibility of the person choosing to receive and use this information to verify the accuracy of any information obtained from this data package. The reader is warned to under take his or her own independent investigation to validate this information. Reports provided within are not compliant with CSA standards.
Emilie Trottier
Mine Hazards Technical Specialist
Mine Rehabilitation Group
Willet Green Miller Center - Level B6
933 Ramsey Lake Road
Sudbury ON P3E 6B5
Email: emilie.trottier@ontario.ca
Phone: 705-280-8658
Ministry of Mines - ©2022, King's Printer for Ontario