Abandoned Mine Inventory for Ontario

MINES (last updated: 2022-04-29 )


GeologyOntario has moved and you should be redirected to the new GeologyOntario in 5 seconds.

Abandoned Mine Identifier: 08397

General Information

Permanent Link to this Record: 08397


Abandoned Mine Identifier: 08397

Official Name: Lake Shore

Site Classification: A

Primary Commodity: Gold

Long Name: 2017570053300

Date Mine Opened: 1918-01-01

Date Mine Closed: 1968-12-31

Mine Closure Reason: Ceasing Production - Other

Mine Closure Plan: Yes

Rehabilitation Plan: No

Mine Plans on File: Yes

Legal Jurisdiction: Mining Act

Date Record Last Modified: 2019-08-08

Location Information

Township or Area: Teck

District: Kirkland Lake

NTS Number: 042A01

Longitude (dd): -80.04605 | Latitude (dd): 48.14955

UTM Zone: 17 | Easting: 570954 | Northing: 5333362

Operational Access Description: Closure Plan # M11 Part Of The Macassa Mine Closure Plan. Access; In The Town Of Kirkland Lake Turn North On The Road That Travels Between The Canadian Tire Store And The Kirkland Lake Mall And Proceed 170m To The Lake Shore Mine Gate. Number 5 Shaft Is Located 150m To The Northwest Of The Mine Gate. Past Producer; 16,620,903 Tons Milled.; Duplicate Amis Data Records 2413,2875. Year 2000: Concrete Cap Over Mine Backfill Raise; Open Raise, Fenced; Concrete Cap Over Raise With New Building Constructed To Serve As A Tool Shed; No.5 Shaft Timber Headframe; No.3 Shaft Capped And Backfilled.


Hazard Feature Information

Mine Feature
Hazard Status
Condition
UTM Zone
Easting
Northing
Crown Pillar
Active
2012 Assessment; According To The Cp, The Lake Shore Property Has Two Main Crown Pillar Complexes; The 201e Stope Series (the North Vein System) And The 207w/404 Stopes (the South Vein System). Details On These Systems Are Included In The 2012 Inspection
17
570954
5333362
Portal Or Decline Ramp
Active
Lakeshore No. 2 Decline (no. 2 Ramp-adit) 2012 Assessment; Located Behind The Perimeter Fence That Surrounds The Lakeshore Basin.has Not Been Rehabilitated Per The Mine Rehab Code Of Ontario. Cap Estimated 3m X 3m. Located In 2011 And Inaccessible, Th
17
571143
5333594
Portal Or Decline Ramp
Active
Lakeshore No. 2 Decline 2012 Assessment; Located Behind The Perimeter Fence That Surrounds The Lakeshore Basin. Appeared To Be Backfilled But According To The Cp, Further Backfilling Is Required To Rehabilitate The Decline. 2011 Mndm - The No. 2 Ramp
17
571143
5333594
Raise To Surface
Active
Shopping Mall East Fill Raise (lakeshore Raise #2) 2012 Assessment; Kirkland Lake Gold Could Not Locate The Raise During Their Initial Investigation Not Was It Observed During The Inspection. Opening Is 2m X 2m, , Cap Is 3m X 3m X 0.35m. Not Located I
17
571037
5333218
Raise To Surface
Active
Shopping Mall Raise (lakeshore Raise #1) (lakeshore 207w Raise) 2012 Assessment; Kirkland Lake Gold Could Not Locate The Raise During Their Initial Investigation Not Was It Observed During The Inspection. Opening Is 2m X 2m, , Cap 1 Is 3m X 3m X 0.4m
17
571007
5333211
Raise To Surface
Active
Shopping Mall West Raise (lakeshore 207 West Fill Raise) 2012 Assessment; Kirkland Lake Gold Could Not Locate The Raise During Their Initial Investigation Not Was It Observed During The Inspection. Opening Is 2m X 2m, Cap Is 3mx 3m X 1m. Not Located
17
570984
5333206
Raise To Surface
Active
201 Sand Pass Raise 2012 Assessment; Located On The Lakeshore Property Behind The Perimeter Fence That Surrounds The Lakeshore Basin. The Raise Haas Not Been Rehabilitated As Per The Mine Rehab Code Of Ontario. 2011 Mndm - The Raise Has Reportedly Bee
17
570762
5333260
Raise To Surface
Rehabilitated
205 Vent Raise 2012 Assessment; Located Behind The Perimeter Fence That Surrounds The Lake Shore Basin. Cap Is 2.44m X 1.83m X 0.457m Located In 2011 And Inacessbile, The Raise Is Capped With A Cap That Meets Code (post 1985) (according To 2013 Closu
17
571265
5333298
Raise To Surface
Active
200 Sand Pass Raise 2012 Assessment; Located Beside The Maintenance Facility On The Lakeshore Property, Behind The Fence That Surrounds The Lakeshore Basin. The Raise Has Not Been Rehabilitated Per The Mine Rehab Code Of Ontario. 2011 Golder - The Rai
17
571022
5333329
Raise To Surface
Active
200 Vent Raise 2012 Assessment; Located Behind A Private Residence And A Garden Shed Has Been Built On Top Of Concrete Cap. Appears To Have Been Capped With Newer Concrete Overtop Of Old Concrete And Does Not Meet Rehab Requirements. 2011 Golder - The
17
570648
5333208
Shaft - 1 Compartment - Inclined Shaft
Rehabilitated
No. 2 Shaft 2012 Assessment; A Service Decline Located West Of The Lakeshore No. 2 Ramp Portal. According To The Cp It Has Been Backfilled With Mine Rock. Appears To Meet Rehab Requirements Described In The Mine Rehab Code Of Ontario. 2011 Mndm - Repo
17
571080
5333582
Shaft - 1 Compartment - Unknown
Active
No. 1 Shaft 2012 Assessment; Believed To Be Located Near The Northeast Corner Of The Kirkland Lake Mall Under A Parking Lot. The Cap Does Not Meet The Requirements Of The Mine Rehab Code Of Ontario. 2011 Mndm - Is Located Near The Northwest Corner Of
17
571078
5333234
Shaft - 1 Compartment - Vertical Shaft
Active
Minaker Shaft 2012 Assessment; Located Just West Of The Northwest Corner Of The Kinross Park In Kirkland Lake. Appeared To Be Capped With A Vent Pipe. Failed To Locate Documents Showing That The Opening Meets The Closure Requirements. 2011 Golder - Exca
17
570952
5333359
Shaft - 1 Compartment - Vertical Shaft
Active
No. 3 Shaft 2012 Assessment; Located East Of The Maintenance Shops On The Lakeshore Property Behind The Perimeter Fence That Surrounds The Lakeshore Basin. Cap Does Not Meet The Minimum Rehab Requirements. Golder 2011 - Excavated August 2011 - Shaft O
17
571027
5333309
Shaft - 1 Compartment - Vertical Shaft
Active
No. 5 Shaft 2012 Assessment; Located In The Vicinity Of The Maintenance Shops. The Shaft Has Not Been Rehabilitated Per The Mine Rehab Code Of Ontario. 2011 Golder - The No. 5 Shaft Was Investigated September 2011. The Shaft Opening Is Surrounded By A
17
570933
5333315
Stope
Active
Stope 207w 2012 Assessment; Located Under The North Wall Of The Kirkland Lake Mall. Scheduled To Be Backfilled In 2012. Crown Pillar Is 3m X 30m X 6m. Currently Backfilled With Waste Rock With Some Remaining Minor Voids.
17
571007
5333211
Stope To Surface
Active
Stope 201 2012 Assessment; Has Been Mined To Surface In Some Locations, And Backfilled In Other Locations. Varying Dimensions On This Feature. Feature Is Currently Inaccessible And Fenced. Requries Geotechnical Study To Confirm Current Condition. Some
17
571240
5333474
Tailings - Confined
Active
2012 Inspection Report; Tailings Reslurry Basin, Little Risk Of Acid Generation
17
570195
5333366
Tailings - Confined
Active
2012 Assessment; Tailings Were Deposited Into Kirkland From The Late 1920's Until The End Of 1967. Beginning In 1989, Tailings From The Area Adjacent To The Crown Pillar Were Reclaimed For Processing At The Macassa Mine Property. Tailings Are Still Pr
17
570954
5333362
Trench
Active
E-vein Trenching Strike 55m, Width 20m. Surveyed In 2011, The Opening Is Inaccessible And Situated Behind Permanent Fencing, Inside The Glory Hole Area.
17
570541
5333180

Mineral Deposit Identifier: MDI42A01NE00022



Terms of Use

Please be aware of the following regarding our AMIS data

The information herein is provided by MINES free of charge and for information purposes only. All information is provided "as is" without warranties or conditions of any kind either expressed or implied. In providing this AMIS database information, MINES and the Government of Ontario accept no liability and make no warranty or any representation regarding the use, accuracy, applicability, completeness, performance, availability , security or reliability of the information. MINES is not responsible for, nor does it independently verify any information, through field measurements or otherwise. It is the sole responsibility of the person choosing to receive and use this information to verify the accuracy of any information obtained from this data package. The reader is warned to under take his or her own independent investigation to validate this information. Reports provided within are not compliant with CSA standards.

Contact

Emilie Trottier
Mine Hazards Technical Specialist
Mine Rehabilitation Group
Willet Green Miller Center - Level B6
933 Ramsey Lake Road
Sudbury ON P3E 6B5
Email: emilie.trottier@ontario.ca
Phone: 705-280-8658


Ministry of Mines - ©2022, King's Printer for Ontario