Ontario Geological Survey
Permanent Link to this Record:
MDI000000003369
Record Name(s) | Ember - 2024, Spark Extension - 2022 |
---|---|
Related Record Type | |
Related Record(s) | |
Record Status | Occurrence |
Date Created | 2023-Mar-21 |
Date Last Modified | 2024-Nov-25 |
Created By | |
Revised By |
Primary Commodities: Lithium
Secondary Commodities: Niobium, Tantalum, Rubidium, Cesium, Tin
Township or Area: Pakeagama Lake Area
Latitude: 52° 37' 6.62" Longitude: -93° 25' 23.55"
UTM Zone: 15 Easting: 471348.79 Northing: 5829917.92 UTM Datum: NAD83
Resident Geologist District: Red Lake
NTS Grid: 53C11SW
Point Location Description: GPS coordinate from field visit.
Location Method: Field Visit with GPS
Access Description: Access is available by helicopter or boat.
2022: Frontier Lithium completed detailed and regional mapping, as well as prospecting (Frontier Lithium, news release, Jan. 31, 2023). A new pegmatite called the Spark Extension was discovered. 2023: Initial parallel channel sampling was completed. 2024: Frontier Lithium drilled below the channel samples and intercepted pegmatite.
Province: Superior
Subprovince: Sachigo
Terrane: North Caribou
Belt: Favourable Lake
Geological Age: Archean
Rock Type | Rank | Composition | Texture | Relationship | Mafic lava flow-unsubdivided | 1 | Host |
---|---|---|---|---|
Pegmatite | 1 | Is |
Rank | Mineral Name | Class | Economic Mineral Type | Alteration Mineral Type | Alteration Ranking | Alteration Intensity | Alteration Style |
---|---|---|---|---|---|---|---|
1 | Spodumene | Economic | Ore |
Mar 21, 2023 (Paul Malegus) - The RGP visited the site on August 12, 2022 with Frontier Lithium staff. Two samples were collected, 22TG0050 returned the following results: 3.08% Li2O, 0.003% Cs2O, 0.09% Rb2O, 55 ppm Ta2O5, 43 ppm SnO2, and 63 ppm Nb2O5 (Frontier Lithium, January 31, 2023 news release). The pegmatite covers an area of 10 x 15 m, composed of spodumene, quartz, muscovite, +/- lepidolite, tourmaline and garnet. Additionally, the company notes the spodumene has a "snowshoe" texture. Initial parallel channel sampling was completed in 2023, returning 2.16% Li2O over a combined 18 m. In 2024 Frontier Lithium drilled below the channel samples and intercepted pegmatite 40 m below, with drillhole PL-138-24 intersecting 1.43% Li2O over 18.8 m (Frontier Lithium, news release, November 19, 2024).
Date: Aug 12, 2022
Geologist: Paul Malegus
Notes: Site visited by RGP.
We are continuously updating our assessment file / technical report information. If you notice errors in the data, please contact us.
Please review our Terms of Use agreement for this data product.
For detailed information regarding this mineral record please contact the Red Lake Resident Geologist District Office