File Type
Approved Assessment
Resident Geologist District
Timmins
Property Name
Edleston Property
Primary Township or Area
Sothman
Secondary Township or Area
Burrows, Halliday, Hutt, Kemp, Nursey, Semple
NTS
41P14NE, 41P14NW, 41P14SW
MLAS Transaction ID
101341, 101342, 101343, 101357
Work Report Number
6037, 6038, 6039, 6042
Year Work Performed
2020
to 2022
Work Performed For
Aston Minerals Ltd
Total Value of Work Approved
$27772435
Work Group
Work Type
Quantity
Comments
Drilling
Downhole Imaging
12 drillholes surveyed
electromagnetic (DHEM) survey, Downhole Optical (“OTV”) & Acoustic Teleview (“ATV”) Surveys.
Drilling
Diamond Drilling
139 drillholes
5000 m. total of 139 NQ and HQ diameter diamond drill holes were completed. 11 field days
Geochemistry
Assaying and Analyses
38,436 samples submitted
A total of 38,436 original drill core sections were submitted for analyses, representing 48,912 m of NQ and HQ drill core
Geology
Compilation and Interpretation - Geology
56 reports reviewed
compilation of historical outcrops
Ground Geophysics
Induced Polarization
43.4 km of line
100 m line spacing with 29 receiver lines and 14 current injection lines.
Petrographic Work
Other Petrographic Work
7 core samples submitted
submitted for for petrographic examination and analysis
Physical
Linecutting
43.4 km of line
work was completed within part of 25 field days recorded in the 2020 2022 exploration program. 40 active receivers per line, and approximately 475 injections total, both with 50 m spacing
Remote Sensing Image
LiDAR
area -130 km2
1 field day. LSI used the Matrix LiDAR system installed in a Cessna 182 airplane flying at an altitude of 850 m above ground level and a forward speed of 215 km/h.